View 1 v175
Upload project file
Select a Microsoft Project XML file (File → Save As → XML format in Microsoft Project).
Drag and drop your XML file here
or
Accepts Microsoft Project saved as XML files
Uploading and parsing…
Configure report
Select one or more renamed Flag1 to Flag20 fields to include in the report.
- Source file
- Tasks parsed
- Renamed flag fields
Choose which populated baseline should be used as Previous Finish in the report.
Required. Enter the Task ID that represents the project endpoint for Critical Path Offset analysis.
Analysis hover mappings
Optional. Choose which XML fields should be used for Resource and Workstream details in Analysis hover boxes.
Includes populated text fields and populated resource fields discovered from the XML. If left blank, the hover will state that no resource field was selected in Step 2.
Includes populated text fields only. If left blank, the hover will state that no workstream field was selected in Step 2.
Drag rows by the handle to set the report order. Only checked rows will render, in the same top-to-bottom order shown here.
Building report…